Hong Kong
IB Maths tutoring for Hong Kong students
AA and AI at HL and SL, Hong Kong-friendly scheduling, IA support and transparent GBP/HKD pricing.
View this tutoring optionWant your child to thrive in IB Maths?
Want to give them a clear path towards a 7?
Build their confidence and give them a clear path towards a 7.
I built a student learning platform just for my students. It tracks their recurring mistakes and their progress throughout lessons. They get access to my tutoring even when I'm not there.
Book a free trial and see if I'm the right fit for your child.

I built a student learning platform for all my students that tracks all the mistakes made during lessons and their progress throughout the syllabus. Students have access to my tutoring in between lessons.
Students can review what went wrong, how to improve, which weaknesses keep recurring, and which areas need more revision. They always know where they stand and what to work on next.
Once a month you get a written report so you stay in the loop with your child's learning.


Tomás Almeida is an IB Maths specialist with 5 years of tutoring experience, working 1-to-1 online with students worldwide, including Hong Kong and Portugal. He holds a BSc in Mathematics and Physics from the University of St Andrews.
He is currently completing an MSc in Data Science at NTU in Singapore.
Tomás achieved 7/7 in IB Mathematics AA HL and 19/20 on his Maths IA, as well as 7s in Physics HL and Chemistry HL. He specialises in IB Mathematics Analysis & Approaches (AA) and Applications & Interpretation (AI), at both Higher Level (HL) and Standard Level (SL), and provides dedicated IB Maths IA support.
A key differentiator of Tomás’s tutoring is the student learning platform he built specifically for his IB Maths students. It tracks topic mastery, recurring mistakes and progress over time, giving students a clear view of their strengths, weaknesses and priorities between lessons. Parents also receive regular progress summaries, helping create a collaborative approach between Tomás, the student and their parents throughout the IB Maths journey.
“I couldn't be more satisfied with Tomás's work. He tutored both my children in Maths and the results were extraordinary: both moved up a level. The most impressive case was my daughter, who has dyscalculia and concentration difficulties. Tomás showed remarkable ability to adapt, patience, and empathy. He managed to capture her attention, motivate her, and help her focus, and for the first time, she was able to truly benefit from online tutoring. Beyond the results, he gave both my children confidence and a genuine enjoyment of Maths. I recommend him without hesitation.”Rosarinho
Improved from grade 3 to 5 in the IB final grade
“I started with Tomás the year of my IB exams, nervous I would fail maths. I was usually getting threes in Year 12. With Tomás I felt I could ask the same question five times if I needed to, which I was too embarrassed to do in class. He's demanding but it was worth it.”Joana
“I can't recommend Tomás highly enough as a Maths tutor. He worked with my child for two years. Patient, clear, and genuinely invested in helping students understand the material rather than memorise it. His sessions made a real difference in both confidence and results. Trustworthy and always punctual.”Felipa C.
Applications & Interpretation · HL & SL
Statistics, modelling, financial maths, technology and interpreting results in context.
1-to-1 online IB Maths tutoring worldwide, including Hong Kong and compatible timezones.
I teach Applications and Interpretation at both SL and HL. Lessons cover statistics, probability, modelling, financial mathematics, GDC technique, and explaining what a result means in the real context of an exam or Internal Assessment.
Start with your location or the part of the IB Maths course where you need specialist help.
Hong Kong
AA and AI at HL and SL, Hong Kong-friendly scheduling, IA support and transparent GBP/HKD pricing.
View this tutoring optionCourse specialist
Focused support for proof, calculus, complex numbers, vectors and Paper 3 from a former AA HL student who scored 7/7.
View this tutoring optionCoursework
Ethical help with topic choice, mathematical rigour, interpretation, reflection and criterion-based feedback.
View this tutoring optionIB Maths AA / AI · HL
Higher Level
IB Maths AA / AI · SL
Standard Level
Approx HKD shown · billed in GBP via Wise, payable in HKD at the day’s rate.
First session is a free 30-minute trial. No commitment required.